Execution of works, consultancy in the field of technology selection and design.
Execution: 325 meters. Ø150mm anchor micropiles, 25 m long, to protect the landslide. Micropiles in self-drilling technology, with reinforcement with a load capacity of 780kN.
Zamawiający: Gmina Miasto Krosno