Execution of works, consultancy in the field of technology selection and design.
Yet another project completed – CFA piles as the main feature.
We carried out work for a private investor in the town of Szymanów near Wrocław.
The scope of works included the construction of:
▪️65 CFA piles with a diameter of 400 mm and a length of 8 m.
▪️The work involved preparing the foundations for a single-family house – both along its outline and under the patio planned in the central part of the building.
The project was carried out in beautiful, sunny weather, although there were significant frosts at night, which did not affect the pace of work.
Geotechnics can be surprising, but not in this case – everything went smoothly and without setbacks.
Zamawiający: Private investor